Welcome. We trade textile machinery. What do you do?

Rainer Hesse - Textilmaschinen Dresden is your first address for your new or used textile machines. Our database offers you a large number of textile machines, which may perfectly complement your business. Rainer Hesse - Textilmaschinen Dresden is your partner for embroidery, finishing, knitting, quilting, sewing, spinning and weaving.

Please choose for finishing - equipment's:


13 Positions in boiler:

Offer Nr. 1 (Position UM 41.277.19963)

1 VIESSMANN 2.hd hand BOILER INSTALLATION designed for STEAM PRODUCTION model M95 A247, NOMINAL OU...

Added on 2022-06-01 by RHesse in in finishing - equipment's / boiler

1 viessmann second hand boiler installation designed for steam production model m95 a247, nominal output 15,5 t/h, nominal steam pressure 16 bar, natuarl gas heated with economizer, mwater treatment, pumps and dosing
- year of construction 2017
more details for this boiler position...

Offer Nr. 2 (Position UM 41.277.19951)

2 MAX WEISHAUPT 2.hd hand BOILER designed as STEAM BOILER UNITS models 2760MW and 1380MW, NOMINAL ...

Added on 2022-05-19 by RHesse in in finishing - equipment's / boiler

2 max weishaupt second hand boiler designed as steam boiler units models 2760mw and 1380mw, nominal capacity 4 m³/h and 2 m³/h
- year of construction 2012 and 2017
more details for this boiler position...

Offer Nr. 3 (Position UM 41.277.19433)

1 LOOS 2.hd hand BOILER UNIT designed as STEAM PRODUCTION BOILER INSTALLATION model UL, NOMINAL ST...

Added on 2022-05-16 by RHesse in in finishing - equipment's / boiler

1 loos second hand boiler unit designed as steam production boiler installation model ul, nominal steam output 3 200 kg/h, nominal pressure 10 bar
- year of construction 1991
more details for this boiler position...

Offer Nr. 4 (Position UM 41.277.19834)

1 BABCOCK WANSON 2.hd hand BOILER UNIT designed as STEAM BOILER model BWS D 60, NOMINAL CAPACITY 6...

Added on 2022-02-21 by RHesse in in finishing - equipment's / boiler

1 babcock wanson second hand boiler unit designed as steam boiler model bws d 60, nominal capacity 6 000 kg/h
- year of construction 1998
more details for this boiler position...

Offer Nr. 5 (Position UM 41.277.19222)

1 BABCOCK 2.hd hand BOILER INSTALLATION designed as STEAM PRODUCTION BOILER model OMNICAL, NOMINAL...

Added on 2022-02-08 by RHesse in in finishing - equipment's / boiler

1 babcock second hand boiler installation designed as steam production boiler model omnical, nominal capacity 8 t/h, pressure 8 bar with gas burner and control panel
- year of construction 1995
more details for this boiler position...

Offer Nr. 6 (Position UM 41.277.19718)

2 BABCOCK 2.hd hand BOILER INSTALLATIONS designed as STEAM BOILER UITS model BWS D 50, NOMINAL CAP...

Added on 2021-11-30 by RHesse in in finishing - equipment's / boiler

2 babcock second hand boiler installations designed as steam boiler uits model bws d 50, nominal capacity 5 000 kg/h steam production, nominal pressure 10 bar, temperature max 184°c
- year of construction 2001
more details for this boiler position...

Offer Nr. 7 (Position UM 41.277.19308)

1 SEFAKO 2.hd hand BOILER INSTALLATION designed as STEAM BOILER for NOMINAL STEAM PORODUCTION of 8...

Added on 2021-05-19 by RHesse in in finishing - equipment's / boiler

1 sefako second hand boiler installation designed as steam boiler for nominal steam poroduction of 8 t/h, pressure 16 bar
- year of construction 1990
more details for this boiler position...

Offer Nr. 8 (Position UM 41.277.17986)

1 INPLAN 2.hd hand BOILER designed as THERMAL OIL BOILER model H1500, MAXIMAL TEMPERATURE 300°C, ...

Added on 2021-05-18 by RHesse in in finishing - equipment's / boiler

1 inplan second hand boiler designed as thermal oil boiler model h1500, maximal temperature 300°c, volume 1726 l with compension tank type at1500
- year of construction 2005
more details for this boiler position...

Offer Nr. 9 (Position UM 41.277.18399)

1 INGATHERM 2.hd hand BOILER designed as THERMAL OIL BOILER model INTEC ET2000 40HSO, CAPACITY 1 ...

Added on 2021-05-18 by RHesse in in finishing - equipment's / boiler

1 ingatherm second hand boiler designed as thermal oil boiler model intec et2000 40hso, capacity 1 860 kw, nominal working temperature 300°c, contents 1 237 l with dual oil and gas burner
- year of construction 1996
more details for this boiler position...

Offer Nr. 10 (Position UM 41.277.19227)

1 VKK 2.hd hand BOILER INSTALLATION designed as STEAM BOILER model STANDARD, NOMINAL CAPACITY 12 t...

Added on 2021-01-15 by RHesse in in finishing - equipment's / boiler

1 vkk second hand boiler installation designed as steam boiler model standard, nominal capacity 12 t/h, nominal pressure 18 bar with combi burner and stainless steel chimney
- year of construction 2006
more details for this boiler position...

Offer Nr. 11 (Position UM 41.277.19229)

1 LOOS 2.hd hand BOILER INSTALLATION designed as STEAM BOILER, NOMINAL CAPACITY 115 Kg/h, NOMINAL ...

Added on 2021-01-15 by RHesse in in finishing - equipment's / boiler

1 loos second hand boiler installation designed as steam boiler, nominal capacity 115 kg/h, nominal pressure 6 bar, volume 85 l
- year of construction 1990
more details for this boiler position...

Offer Nr. 12 (Position UM 41.277.19230)

1 ROUCKA SLATINA 2.hd hand BOILER INSTALLATION desigbed as ELECTROC STEAM BOILER, NOMINAL CAPACITY...

Added on 2021-01-15 by RHesse in in finishing - equipment's / boiler

1 roucka slatina second hand boiler installation desigbed as electroc steam boiler, nominal capacity 120 kg/h, nominal pressure 9,5 bar
- year of construction 1993
more details for this boiler position...

Offer Nr. 13 (Position UM 41.277.19107)

1 STANDARD 2.hd hand BOILER INSTALLATION designed as STEAM MANFUCTUR BOILER model VKK for GAS and ...

Added on 2020-11-24 by RHesse in in finishing - equipment's / boiler

1 standard second hand boiler installation designed as steam manfuctur boiler model vkk for gas and oil heating, nominal capacity 12 t/h with economiser and chimney
- year of construction 2006
more details for this boiler position...


If you require any further information, please do not hesitate to contact us.
These offers remains unsold.

(c) 2022 Rainer Hesse Textilmaschinen Dresden


Jugendschutzhinweis zu dieser Seite